Hello Experts,


need help in following scenarios-


Scenario 1:

We have our NWDI installed on CE server, during upgradation it’s advised not to hold any activities in our workspace.

Due to this, we put our developments on hold until the upgradation process is over.

Is there any way to avoid this sitation such as having separate server specifically for NWDI or any other options.

 

Scenario 2:

Suppose UserA is working on some requirement(new req) by checking out sampleDC,  once the changes are done he checks in the code which is now in Integration system.

Now, there is some bug occurred in Prod which is to be fixed on priority . this change should not carry the changes made by user A(explained in above line) as that is still in Integration system for testing.

 

Is there any way we can hold the changes w.r. t new requirement till Integration system and move only bug fixes(excluding new req changes) to production.

 

Transport Movement in place

sandbox->Integration-> Dev-> Qua->Prod


Thanks in advance,

Priya